Stone patio beside glazed house doors beneath a timber pergola

RW Brickwork & Construction LTD

Hard Landscapingin Whitchurch, Shropshire

Practical outdoor spaces, including concrete works. Fencing is not offered. Start with a clear scope, a free survey and a fixed-price quotation.

  • Free surveys & quotes
  • Fixed-price quotations
  • 9 years’ industry experience
  • NVQ Bricklaying
  • £10 million public liability cover

Your home, your priorities

Hard Landscaping shaped around the way you live

Hard landscaping gives a garden its structure: routes, usable spaces and boundaries between activities. RW helps homeowners in Whitchurch consider outdoor layouts around the way the garden is used. Levels, access and drainage shape what is suitable, not just the amount of space available.

A useful scheme needs more than an attractive surface. Connections to the house, existing features and changes in height affect the result. RW’s hard landscaping includes patios, paving, driveways, garden walls and concrete works. Fencing is not offered. Discuss which elements belong in your project rather than assume every outdoor task is included.

Begin with household priorities: a clearer path, an area to sit, or a garden that is less awkward to move through. A free survey considers the practical constraints. Materials, finishes and associated construction should be agreed for the site, with a fixed quotation describing the accepted scope.

Before work begins

Resolve the cause, not just the visible problem

01

A large garden can still be inconvenient. Awkward routes, isolated seating and abrupt levels can make normal activities difficult. Another paved patch may preserve the underlying issue. Review the whole arrangement before adding isolated features.

02

New hard surfaces can redirect rainwater towards the house, neighbouring land or low spots. Existing damp conditions should not be hidden beneath new construction. Consider drainage, ground and appropriate discharge together rather than treat water as a finishing detail.

03

An unclear scope leaves questions about excavation, removal, thresholds and making good. Restricted access affects movement of materials and waste. Discuss those points before accepting a price so the practical work behind the visible layout is understood.

Our process

From your first conversation to completion

01

Discuss the outcome

Tell Ryan what you want hard landscaping to change about your home. Explain the practical problem, who uses the space and which features matter most. Drawings, photographs and a clear address can help the initial discussion, but the final scope still depends on the site. If other trades or permissions are involved, raise them early so the project is considered as a whole rather than as an isolated finish.

02

Survey the existing conditions

A free site survey helps establish the existing construction, available access and the limits of the proposed work. Discuss boundaries, neighbouring property, drainage and any areas that must stay usable. Where an issue needs specialist investigation or design, it should be addressed before the work is treated as straightforward. The aim is a defined starting point, not an unsupported promise that every hidden condition can be predicted.

03

Agree the scope and quotation

Review the fixed-price quotation against the work you expect. The specification should make it clear what preparation, construction and finishing are included, and what depends on approvals or separate arrangements. Ask about material choices, site access, programme and payment terms before agreeing. If your plans change, discuss the effect on scope and price rather than assuming extra work is covered by the original agreement.

04

Carry out the agreed work

The construction sequence follows the agreed project and site requirements. Preparation, supporting work and the visible finish need to be considered together. For extensions and new builds, RW coordinates the trades from groundworks through to the finished kitchen. For smaller projects, establish the relevant boundaries of the service in the quotation. Keep access and communication arrangements clear throughout, particularly where the household remains in occupation.

05

Review completion and care

At completion, discuss the agreed work, any applicable building control sign-off and the care appropriate to the materials. For new works, check the written structural guarantee and its scope rather than assuming all elements have identical cover. Keep the quotation, relevant approvals and maintenance information together. A clear handover makes it easier to understand what has been built and which questions to raise if something later needs attention.

What matters in the finished work

Practical benefits, not just a different appearance

A garden that works naturally

Start with household routines and useful connections. Consider access and existing features together so the layout is not a collection of isolated decorative areas.

Clarity before commitment

A survey and defined fixed quotation identify inclusions, exclusions and outstanding choices. This helps compare the full project rather than rely on a broad description.

Practical details addressed early

Drainage, thresholds and access are easier to consider before construction. Maintenance discussion also makes the long-term care of the chosen space understandable.

The construction details

Planning your hard landscaping project

Layout around everyday use

Explain the activities the space needs to support and what currently obstructs them. Existing planting, covers, outbuildings and boundaries influence an arrangement. Level changes require careful consideration of comfortable routes and the suitability of steps or supporting construction. Do not add elements automatically because they appear in a reference photograph. Concrete work may form part of the agreed scope, but dimensions and construction choices should be recorded before work. A coherent layout supports normal use while acknowledging the existing garden, rather than simply increase hard surfacing for its own sake.

Ground preparation and access

Existing surfaces, disturbed ground and buried obstructions affect preparation. Choose an approach based on the site and intended use, not a universal excavation depth. Narrow passages, steps and shared routes influence deliveries and waste removal. Discuss protection and storage areas, with known services and drains identified and further checks considered where necessary. The quotation should explain included preparation and how genuinely unforeseen conditions are discussed. It cannot honestly promise that every concealed condition is known before excavation. Access deserves the same early attention as the proposed finish.

Drainage and connections to the home

Changes to hard surfaces alter how rainfall moves. Consider ground conditions and appropriate destinations for water; sending runoff towards a boundary or existing drain is not automatically acceptable. External levels must respect damp protection, ventilation openings and thresholds. Easier access does not remove the need to protect the building from water. Concrete’s relationship with adjacent construction and drainage needs assessment where included. Local restrictions and significant ground-level changes can affect permission requirements. Check relevant controls rather than assume every garden project is exempt from all approvals.

Agreed boundaries and ongoing care

Identify the areas changing, construction included and exclusions such as fencing. Discuss retained features and making good. Select materials for site conditions and maintenance preferences rather than appearance alone. Care depends on the specification: leaves and debris need clearing, drainage routes need remaining open, and movement or deteriorating joints deserve attention. Cleaning methods should follow suitable guidance because inappropriate treatment can damage surfaces. Considering upkeep before selection lets you judge practical responsibilities alongside the proposed appearance. Hard landscaping changes the way the whole space functions, not just its first impression.

Material and method examples describe considerations for your survey, not a promise that every option suits your property or is included in your quotation.

Straight answers

Hard Landscaping: your questions answered

How much does hard landscaping cost in Whitchurch?+

The price depends on the measured scope, existing condition, access, material choices and any supporting work. A small, straightforward job cannot be priced on the same basis as one involving excavation, structural changes or difficult access. RW offers a free site survey and a fixed-price quotation for the agreed scope. Explain your priorities and share any drawings so Ryan can discuss what needs assessing. There is no published standard price or promise that an online estimate will cover your particular property.

How long will the work take?+

A programme needs to reflect the size of the work, access, material availability, approvals and the condition found on site. Weather can also affect outdoor construction and curing. Discuss a realistic sequence and any disruption before accepting your quotation. No standard completion time or guaranteed start date is advertised. If you have an important deadline, explain it at the first conversation so it can be considered rather than assumed.

What happens at the free survey?+

The survey starts with what you want to achieve and the current condition of the property. It is an opportunity to discuss access, boundaries, nearby buildings, existing finishes and any drawings or approvals you already have. The information helps define the proposed scope before a fixed-price quotation. A site visit is not a substitute for specialist investigations or structural design where those are needed; the next steps should reflect the actual project.

Who arranges planning permission and building control?+

Clients are responsible for arranging their planning applications. RW manages building control inspections and sign-off for building work where applicable. Planning permission, building regulations and any shared-boundary obligations are separate considerations. Whether a particular project needs approval depends on the work and property. Check with the relevant authority before starting; do not assume that a neighbour’s similar project settles the requirements for your home.

What guarantee is available?+

RW confirms a 15-year structural guarantee on new works, subject to the written terms. This is not a blanket guarantee for every finish, repair, existing structure or product. The precise coverage and exclusions must be checked against your project’s written documentation before you commit. Ask Ryan which parts of your proposed work fall within that guarantee. Manufacturer information and normal maintenance requirements may be separate from structural cover.

How long should the finished work last?+

There is no single lifespan for every project. The existing ground or structure, material selection, exposure, use, installation requirements and ongoing care all affect performance. Ask which maintenance tasks apply to your chosen specification and what warning signs deserve attention. A stated structural guarantee is not a prediction of the lifespan of every material. Comparing proposals is easier when they explain the preparation and construction, not only the visible finish.

Do you offer emergency or same-day work?+

Emergency availability and same-day attendance are not advertised or guaranteed. Call Ryan to discuss your circumstances and current availability during the confirmed hours: Monday to Friday 8am–5pm and Saturday office hours 8am–1pm. If a wall or structure appears unsafe, keep people away and seek appropriate urgent safety advice rather than waiting for a routine quotation. The website does not offer an emergency booking service.

Do you work outside Whitchurch?+

RW serves Whitchurch (Shropshire), Chester, Nantwich, Malpas, South Cheshire, Shrewsbury, Crewe, Wem, Market Drayton. Share your address and the type of work you are considering so access and the practical scope can be discussed. Being within a listed service area does not mean a particular start date or site condition is already confirmed. The first step is a conversation with Ryan, followed by a free survey and a quotation for an agreed project.

How do payments work?+

RW accepts card and bank transfer; cash is not accepted. Deposit terms and payment milestones have not been published, so request the arrangements in writing alongside your quotation. Do not assume a no-deposit offer, weekly payment schedule or payment on completion only. A clear scope, agreed price and written payment arrangements help you compare the whole proposal rather than relying on a headline figure.

Does hard landscaping include fencing?+

No. Fencing is not offered by RW. The confirmed outdoor services include patios, paving, driveways, garden walls and concrete works. Explain which areas you want to change and any retained features, then agree the specific work in the quotation. Do not assume soft landscaping, planting or every garden task is included in a hard landscaping proposal.

RW Brickwork & Construction homepage

Your next step

Let's discuss your hard landscaping

Talk to Ryan about your property and the result you need. Start with a free site survey and a fixed-price quotation for the agreed work.

07400 610326

NVQ Bricklaying · £10 million public liability cover

Contact details and service areas
Call nowFree quote